CPACE II Implementation Phase

Evaluation (SAMPI)

CPACE EValuation SRI site visit April 14-15 Schedule for MSU and LCC

CPATH evaluators meeting Florida Jan 2011. Summary notes from Mary Anne

Engagement of Stakeholders

CPACE II AB Membership Status: This table shows that status of the AB for CPACE II
AB Membership roles

Employers Interviewed CHE: Document updated 06-15-10 contains a list with contact information for all the CHE employers that were interviewed (CPACE I). We will use this list as a starting point to obtain authentic engineering problems.

Employers interviewed CHE:  Document updated 11-22-10 contains a list with contact information for all the CHE employers that were interviewed (CPACE I). We will use this list as a starting point to obtain authentic engineering problems.

Authentic Problems (AP) Generation Process

 Authentic Problems Generation Process: First draft presented by CSW on July 27, 2010 meeting

Draft Nov 11, 2010 Used during the AB meeting on Nov 11, 2010

Version 12-14-10 This revision incorporates the AB members suggestions.

Revised Version Feb 2011 including Visual

  • CPACE: AP information page: This document contains general information about the CPACE Project and the AP collection. It is sent along with the outreach e-mail.

First Advisory Board Meeting November 11, 2010

Preperation for the Meeting

Preperation Process(Nov. 11, 2010) : Contains all documents used to prepare for AB meeting

Draft Agenda: Prepared by Cindee and Kysha. Discussed on 08-10-10 meeting and 09-14 and 09-28 and 10-19. The agenda is edited in real time during the team meetings hence, the last version reflects up to date changes.

CPACE AB meeting Nov 11, 2010- Planning. Attendance list: Contains the list of the team members and AB members that will be able to attend on November 11, 2010

To-Do's list: Tables with a list of tasks that need to be decided and assigned in preparation for the AB meeting on Nov 11, 2010. This page is edited in real time during the team meetings hence, the last version reflects up-to-date changes.

After the Meeting

After the Meeting (Nov. 11, 2010) : Contains all documents used to summerize and conclude the AB meeting

Summary from Authentic Problem Activity: Bullet point summary based on the activity on the AP collection.

CPACE Advisory Board: Authentic Problem Identification Ideas Nov 17, 2010

Follow up after the meeting: After the meeting a set of follow up materials was sent to the AB members. We also contacted those unable to participate. E-mail cover.
 
 
 
 Advisory Board Meeting June 7,2012
 
Preperation for the Meeting
 
Preperation Process (June 7, 2012) : Contains all documents used to prepare for AB meeting
 
After the Meeting
 
After the Meeting (June 7, 2012) : Contains all documents used to summerize and conclude the AB meeting
 
 

Instructional Development

Schedule for Target Courses 

Updated 11-11-10

 Authentic Problems from Industrial Stakeholders

Cascade Engineering

Pilot Meeting to request Authentic Problems

Cascade Engineering Problems

MSU courses

Instructional Modules Development

 CPACE modules preparation process. Draft prepared on 2010-06-14 (Jon Sticklen)

Overview of Module Development.  Draft prepared on June 9, 2010 (C E Vergara)

EGR 102 Process

Meeting with EGR 102 Faculty Feb 03, 2010

Meeting with EGR 102 faculty Jun 2, 2010

Target courses Prerequisites and EGR 102 enrollment status for fall 2010: Wendy generated these data

LCC courses

Fall 2010

CPSC 131:

Math 151:

Spring 2011

 CPSC 131:

Math 151:

  •  Problem: Is the same as Fall 2010

Math 152:

Data Collection and Analyses

CPACE II Capstone Evaluation Rubric: This is the rubric that we will use to start the IRB process. This rubric is based on the FITness report. (Being Fluent with Information Technology 1999. http://books.nap.edu/openbook.php?record_id=6482&page=29)

Design statement and course learning objectives for the CE capstone course (from 2009) 

Instruments and Consent Forms

Student Survey Questionnaires

LCC Fall 2010

CPSC 131:

Math 151:

LCC Spring 2011

CPSC 131: 

MSU Spring 2011

CE 221:

ChE 210:

EGR 102:

Consent Forms

Standard Consent Form. Most of the on-line surveys have the consent at the beginning of the questionnaire. The language is similar to this standard.

Analyses

LCC Fall 2010

Math 151:

LCC Spring 2011

Math 151:

Math 152: