Evaluation (SAMPI)CPACE EValuation SRI site visit April 14-15 Schedule for MSU and LCC CPATH evaluators meeting Florida Jan 2011. Summary notes from Mary Anne Engagement of StakeholdersCPACE II AB Membership Status: This table shows that status of the AB for CPACE II
Employers Interviewed CHE: Document updated 06-15-10 contains a list with contact information for all the CHE employers that were interviewed (CPACE I). We will use this list as a starting point to obtain authentic engineering problems. Employers interviewed CHE: Document updated 11-22-10 contains a list with contact information for all the CHE employers that were interviewed (CPACE I). We will use this list as a starting point to obtain authentic engineering problems. Authentic Problems (AP) Generation ProcessAuthentic Problems Generation Process: First draft presented by CSW on July 27, 2010 meeting Draft Nov 11, 2010 Used during the AB meeting on Nov 11, 2010 Version 12-14-10 This revision incorporates the AB members suggestions. Revised Version Feb 2011 including Visual
First Advisory Board Meeting November 11, 2010Preperation for the MeetingPreperation Process(Nov. 11, 2010) : Contains all documents used to prepare for AB meeting
Draft Agenda:
Prepared by Cindee and Kysha. Discussed on 08-10-10 meeting and 09-14
and 09-28 and 10-19. The agenda is edited in real time during the team
meetings hence, the last version reflects up to date changes.
CPACE AB meeting Nov 11, 2010- Planning. Attendance list: Contains the list of the team members and AB members that will be able to attend on November 11, 2010 To-Do's list: Tables with a list of tasks that need to be decided and assigned in preparation for the AB meeting on Nov 11, 2010. This page is edited in real time during the team meetings hence, the last version reflects up-to-date changes. After the MeetingAfter the Meeting (Nov. 11, 2010) : Contains all documents used to summerize and conclude the AB meeting
Summary from Authentic Problem Activity: Bullet point summary based on the activity on the AP collection. CPACE Advisory Board: Authentic Problem Identification Ideas Nov 17, 2010 Follow up after the meeting: After the meeting a set of follow up
materials was sent to the AB members. We also contacted those unable to
participate. E-mail cover. Advisory Board Meeting June 7,2012 Preperation for the Meeting Preperation Process (June 7, 2012) : Contains all documents used to prepare for AB meeting After the Meeting (June 7, 2012) : Contains all documents used to summerize and conclude the AB meeting Instructional DevelopmentSchedule for Target CoursesAuthentic Problems from Industrial StakeholdersCascade EngineeringPilot Meeting to request Authentic Problems
MSU coursesInstructional Modules DevelopmentCPACE modules preparation process. Draft prepared on 2010-06-14 (Jon Sticklen) Overview of Module Development. Draft prepared on June 9, 2010 (C E Vergara) EGR 102 ProcessMeeting with EGR 102 Faculty Feb 03, 2010 Meeting with EGR 102 faculty Jun 2, 2010 Target courses Prerequisites and EGR 102 enrollment status for fall 2010: Wendy generated these data LCC coursesFall 2010CPSC 131: Math 151: Spring 2011CPSC 131:
Math 151:
Math 152:
Data Collection and AnalysesCPACE II Capstone Evaluation Rubric: This is the rubric that we will use to start the IRB process. This rubric is based on the FITness report. (Being Fluent with Information Technology 1999. http://books.nap.edu/openbook.php?record_id=6482&page=29) Design statement and course learning objectives for the CE capstone course (from 2009) Instruments and Consent FormsStudent Survey QuestionnairesLCC Fall 2010CPSC 131: Math 151:
LCC Spring 2011CPSC 131: MSU Spring 2011CE 221: ChE 210: EGR 102: Consent FormsStandard Consent Form. Most of the on-line surveys have the consent at the beginning of the questionnaire. The language is similar to this standard. AnalysesLCC Fall 2010Math 151: LCC Spring 2011Math 151: Math 152: |